Lift & Install Operation in Coventry…

Mechanical Movements were in Coventry last week installing several bits and pieces at Oakley Grove School, Leamington Spa…

The items installed included:

  • 3x Air Source Heat Pumps at 3550kg/ 3.5tonne
  • 1x Sitewide Heating Pump at 2000kg/2tonne
  • 1x Electric Transformer at 5000kg / 5tonne
  • Sundry Pipework at 2000kg/2.5tonne
  • 3x pallets of solar panel equipment at 2500kg/2.5tonne
  • 4x control panels at 1500kg/1.5tonne

To install the equipment, a 160-tonne mobile crane with 46 tonnes of ballets was used to lift and install all the plant and equipment on the sports hall plant deck. This achieved a lifting capacity of 4759kg at a total radius of 40m.

Our lifting experts successfully completed the intricate installation whilst adhering to all necessary health and safety protocols. Well done team!