Working in Westminster

This week we are working in Westminster – Broadway, managing the lifting operations of some considerably heavy AC equipment on this busy Central London street.

Assisting the Building Services installer at the site, we have been moving 3 x Air Conditioning units, each weighing 6 tonnes, onto the rooftop of this 15 storey mixed-use retail and residential building.

Utilising the on-site tower cranes, at a radius of 38m, we attached our custom-fit box spreader system before hoisting each of the units onto the roof plant area ready for connections.