Loading & Lifting at St Pauls
Our latest lift was in White Hart Street EC4 this week, delivering and lifting 2 no condensers and flatpack Flackwood Air Handing Units.
Having first stored all of the components at our secure storage facility in Kent, awaiting the suitable installation date, we transported all the equipment to site using our 26 tonne rigged Hiab lorry ready to be lifted.
We then utilised the on-site goods lift to reach the 7th floor of the building, before manouvering each unit with our piano plan stair climber into the very restrictive 8th level plant room.
All sections were then safely in position, ready for our client – Sale Group to manage the final connections.