12 Feb 2019
A Look Back…
A look back to when Mechanical Movements managed the lifting for the replacement of chillers, and carried out steel refurbishment works, at the iconic Tower of London. Access to location was very tight, we conducted a dummy run with the crane over the drawbridge and used extra propping supports to comfortably accommodate the weight.